• Sports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale
  • Sports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale
  • Sports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale
  • Sports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale
  • Sports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale

Sports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale

Warranty: 12 Months
Game: Leisure Area
Thickness: Customized
Color: Grass Green
Installation Ways: Fixed
Usage: Outdoor, Indoor
Customization:
Gold Member Since 2017

Suppliers with verified business licenses

Rating: 5.0/5
Trading Company
  • Overview
  • Product Parameters
  • Detailed Photos
  • Installation Instructions
  • FAQ
Overview

Basic Info.

Model NO.
LDK2019ADA-D1
Feature
Waterproof
Material
Artificial Grass
Function
Waterproof, Anti-Static, Thermal Insulation
Delivery Time
7-30days
Pile Height
20mm
Grass Silk
8800dtex
Gauge
3/8inch
Stitches Rate
190needle/Meter
Backing
PP+Net+SBR Latex
Rate
19950needles/Square Meter
Colour
Double Green
Logo
Customized Logo Availale
Packing
Safety 4 Layer Package
OEM or ODM
Yes
Specification
customize
Trademark
LDK
Origin
China
Production Capacity
1000sets/Month

Product Description

Product Parameters

 

Product Name
 Customized Artificial Grass And Landscaping Suitable For   Fencing/greening/ecoration
  Model No   LDK1053224-LK01
Pile Height   20MM
Grass silk   8800Dtex
Gauge   3/8inchinch
Stitches Rate   190Needle/meter
Backing   PP+NET+SBR latex
Rate   19950needles/square meter
Colour   Double green
Size
Customize
Safety
We have a strict quality control system. All the material , structure, parts and products should pass all the test before mass production and shipment.
OEM OR ODM
Yes, all the details and design can be customized. We have professioanl design engineers with more than 40 years experience.
Packing
Safety 4 layer package: 1st EPE & 2nd Weaving Sack & 3rd EPE & 4th Weaving Sack
Applications
All tennis/soccer floor equipment can be used for professional competition, training, sports center, gymnasium, community, club,univerties, school etc.
 
Sports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale


 

Detailed Photos

 

Sports Football Basketball Tennis Court Artificial Turf Manufacturer WholesaleSports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale
Sports Football Basketball Tennis Court Artificial Turf Manufacturer WholesaleSports Football Basketball Tennis Court Artificial Turf Manufacturer WholesaleSports Football Basketball Tennis Court Artificial Turf Manufacturer WholesaleSports Football Basketball Tennis Court Artificial Turf Manufacturer WholesaleSports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale

 


 

Installation Instructions

Preparation work before construction
(1) Review the size of the construction site to see if it matches the requirements of the lawn ordering drawings. At the same time, strictly check the quality of the site foundation to prevent the occurrence of problems affecting the quality of artificial turf paving due to foundation quality problems.
(2) Clean the site so that the surface is free of stones and other debris. If conditions permit, the site should be closed as much as possible to prevent the entry of non-construction personnel during construction from affecting the quality and progress of the construction.
(3) Check whether the straw rolls meet the technical requirements of the order contract, and whether the size and roll number of each straw roll correspond to the construction drawings.
(4) Check whether the glue, joint tape, and tools used for construction meet the construction requirements.
(5) Check whether the quartz sand and rubber particles meet the construction requirements. Special attention should be paid to that the quartz sand used for construction must be dry, and wet quartz sand is never allowed to be used for construction.

Sports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale


Construction process
1. Measure and draw the bottom line
Draw the lines carefully and clearly on the foundation surface of the site according to the drawing dimensions. All marking lines must be double lines. Tools used: ink fountain, two-color pencil, steel tape measure, cement nails, hammer

2. Lawn preparation
Move all construction grass rolls to the side of the construction required location according to the requirements of the drawings.

3. Unroll and trim the grass roll
Put the grass roll into the paving position and unfold it. After sorting and confirming that there are no wrinkles, distortions, etc., cut off the excess edge of the grass roll (the part without grass seedlings). After cutting, ensure that the width of the grass roll is not less than 4 meters. (The width may exceed 4 meters due to production reasons) At the same time, ensure straightness; then put the second roll of grass into the designated position and unfold it. When unfolding, put the extra side on the first roll of lawn, and then connect it with the first roll of lawn. Cut off the overlapping part of the roll, and trim the excess on the other side. The rest of the grass scrolls are deduced in sequence. In order to ensure the beauty of the site, when laying grass, the lawns should be overlapped as closely as possible, but there should be no overlap after trimming. At the same time, it should be ensured that the lawn and the grass filaments in the most edge row of the lawn cannot be too far apart, at most one row of the lawn. distance.
(Due to the rolling of the lawn, it is easy for the grass seedlings to be overwhelmed, but after being exposed to the sun, the grass seedlings will naturally stand upright)

4. Bonding seam edges
Fold the edges of the repaired grass roll upwards evenly by 20---30cm, place the prepared 20 cm wide seam tape on the basis between adjacent grass rolls, and then evenly apply glue (glue usage amount Please refer to Special Tip No. 4), let it dry naturally for a period of time, and then put down the seam edge (note: do not press the grass seedlings on both sides under the seam edge). After bonding, check the solidification of the glue. When the glue is about to solidify, manually step back and forth on the seam edge to ensure that the seam edge, glue, and seam tape are fully bonded.
Tools used: Utility knife, squeegee

5. Cutting of marking lines
Find the reserved marking line on the lawn, use a knife to cut it in the middle of the marking line, and let it shrink naturally for a period of time (half a day or a day), then use a utility knife to cut out the marking line along the drawn line. Location.
Tools used: utility knife

6. Bonding marking line
Cut the rolled white lawn into long strips of corresponding width, place it at the reserved marking line, and then glue it to the green grass next to it with a 30 cm wide seam tape. The process is basically the same as the bonding of green grass seam edges.
Tools used: Utility knife, squeegee

7. Inject quartz sand
Spread the prepared quartz sand evenly on the site (a sand injection machine can be used on qualified sites), and carefully brush the quartz sand with a brush so that the quartz sand can naturally fall to the roots of the grass seedlings and play a role. The function of making grass seedlings stand upright naturally prepares for the injection of rubber particles.
Tools used: shovel, sand truck or sand injection machine

8. The process of injecting rubber particles is the same as injecting quartz sand.

Sports Football Basketball Tennis Court Artificial Turf Manufacturer Wholesale
 
FAQ

(1)Do you have R&D department please?
Yes, all the staff in the department are with more than 8 years experience Forall the OEM and ODM customers, we offer free design service if need.

(2)What is the after sale service please?
Reply within 24 hours, 12 months warranty, and service time up to 10years.

(3)What is the lead time please?
Usually it is 0-7 days for samples, we have artificial grass stock for some models, and 10-20 days for mass productions, the lead time vary with seasons.

(4)Does artificial grass have a limited life?
It has long life lasting 8-10 years. Artificial grass is a synthetic product exposed to outside. With anti-UV function the grass guarantees users up to 8 and 10 years life span. The development of manufacturing fibers of artificial grass is taking giant steps forward, thus offering greater resistance to wear and the flattening of yarns. So it is important to choose high quality artificial grass when purchasing.

(5)What is your trade terms ?
Term of price: FOB,CIF,EXW,DDP,DAP,Term of payment:TT,LC.

(6)How to install it?
lt is very easy.According to different floor situation, please choose different ways. Also you can contact us for more installation tips.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now